More info . . .
|
1448 |
1 August 1932 |
West Neebish Channel, Course 6 Rock Cut: View looking south from upper cofferdam, excavation complete to 28 ft. grade |
More info . . .
|
1449 |
1 August 1932 |
West Neebish Channel, Course 6 Rock Cut: View looking north from lower cofferdam, excavation complete to 28 ft. grade |
More info . . .
|
1450 |
8 July 1932 |
St. Marys Falls Canal: Lower New timber guard gates, lower end of Weitzel Lock, pontoon derrick handling one leaf through Poe Lock |
More info . . .
|
1451 |
28 March 1933 |
St. Marys Falls Canal: View looking down east side of Poe Lock pump tunnel shaft, numbers give elevation referred to canal datum |
More info . . .
|
1451a |
7 June 1933 |
St. Marys Falls Canal: Repairs to timber wall, north side of west nose pier, between Weitzel and Poe Locks, and painting upper Poe Lock guard gates, view looking west |
More info . . .
|
1452 |
28 March 1933 |
St. Marys Falls Canal: Poe Lock pump tunnel shaft, numbers give elevation referred to canal datum |
More info . . .
|
1452a |
7 June 1933 |
St. Marys Falls Canal: Repairs to timber wall, north side of west nose pier, between Weitzel and Poe locks, at junction of old cofferdam, and painting upper guard gates of Poe Lock, canal unwatered, view looking southeast |
More info . . .
|
1453 |
24 October 1933 |
St. Marys Falls Canal: Dredge M- No. 9, working on Lake Munuscong Channel, contract with Great Lakes Dredge and Dock Co. dated 6 October 1933 under NIRA |
More info . . .
|
1454 |
24 October 1933 |
St. Marys Falls Canal: Dredge M- No. 9, working on Lake Munuscong Channel, contract with Great Lakes Dredge and Dock Co. dated 6 October 1933 under NIRA |
More info . . .
|
1455 |
25 May 1935 |
St. Marys Falls Canal: Davis Lock, load of autos upbound |
More info . . .
|
1456 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Transmitting filling signal from lower end of Davis Lock |
More info . . .
|
1457 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Receiving filling signal at upper end of Davis Lock |
More info . . .
|
1458 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Control valve set to correspond with filling signal repeating order back to lower end of Davis Lock |
More info . . .
|
1459 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Receiving check on filling signal at lower end of Davis Lock |
More info . . .
|
1460 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Signal switch operated by Tanner Valve indicating direction of valve motion |