Items
Item Number Date Description
0905 More info . . . 0905 16 November 1913 Fourth Lock Excavation: Third Lock gates; beginning erection south leaf gate No. 4, lower girder and end vertical
0906 More info . . . 0906 23 November 1913 Fourth Lock Excavation: Third Lock machinery; upper filling valves and engines in place
0907 More info . . . 0907 25 November 1913 Fourth Lock Excavation: Third Lock machinery; upper miter walls and valve pit, placing valve pit gratings
0908 More info . . . 0908 25 November 1913 Fourth Lock Excavation: Third Lock masonry; bird's-eye view looking northeast, flag shows last block completed, wall
0909 More info . . . 0909 26 November 1913 Fourth Lock Excavation: West canal, section 2; concrete foundation for cofferdam crib and patching seams, north wall, 2392 E
0910 More info . . . 0910 2 December 1913 Fourth Lock Excavation: East approach; setting crib 23, north side Poe Lock approach, looking northeast from lower lock gates
0911 More info . . . 0911 2 December 1913 Fourth Lock Excavation: Pump house, basement walls, pump well and accumulator room of Third Lock, view looking northeast
0912 More info . . . 0912 19 December 1913 Fourth Lock Excavation: Third Lock gates; view of both leaves, gate No. 4 before riveting
0913 More info . . . 0913 27 December 1913 Fourth Lock Excavation: East approach; sheet pile cofferdam below Poe Lock, between cribs 22 and 23, north side
0914 More info . . . 0914 27 December 1913 Fourth Lock Excavation: Third Lock construction plant, east end; lock gates and operating machinery, gate No. 4 partially erected
0915 More info . . . 0915 6 January 1914 Fourth Lock Excavation: Third Lock pumping plant; view under pump well, 30 in. pipe in place
0916 More info . . . 0916 6 January 1914 Fourth Lock Excavation: Gates; 20" X 46" X 47' timber for upper guard gates
0917 More info . . . 0917 6 January 1914 Fourth Lock Excavation: Gates; construction of guard gate No. 1, general view looking southeast
0918 More info . . . 0918 6 January 1914 Fourth Lock Excavation: Gates; construction of north leaf, gate No. 1, view looking southeast
0919 More info . . . 0919 6 January 1914 West Canal, Section 2; Detail of South Wall from Station: 2200 E to 2400 E