0607 More info . . . 0607 9 March 1911 Repairs to South Canal Wall: Detail of rock face, showing anchor rods and concrete forms
0608 More info . . . 0608 9 March 1911 Repairs to South Canal Wall: Interior of concrete forms, showing anchor rods; face reinforcement not yet placed
0609 More info . . . 0609 8 April 1911 New Lock and Canal: Site of new headrace, looking east from west dam, showing new north dike under construction
0610 More info . . . 0610 8 April 1911 New Lock and Canal: New north dike, view looking west, showing train dumping from trestle
0611 More info . . . 0611 8 April 1911 New Lock and Canal: Site of headrace and controlling works, looking southwest from new north dike trestle at section 3000 E
0612 More info . . . 0612 8 April 1911 New Lock and Canal: Canal construction; northwest pier, eight cribs in the ice
0613 More info . . . 0613 13 April 1911 New Lock and Canal: Pump well excavation; view from coping, Poe Lock
0614 More info . . . 0614 13 April 1911 New Lock and Canal: Pump well excavation; view from top, showing south side of completed excavation
0615 More info . . . 0615 13 April 1911 New Lock and Canal: Pump well excavation; view in bottom showing portal, Poe Lock tunnel
0616 More info . . . 0616 13 April 1911 New Lock and Canal: Pump well excavation; view from top of well, showing north side of completed excavation
0617 More info . . . 0617 13 April 1911 New Lock and Canal: Pump well excavation; view in well, looking north, showing portals of drainage tunnels to third and fourth locks
0618 More info . . . 0618 13 April 1911 New Lock and Canal: Lock pit excavation, looking on pump well from north wall of Poe Lock
0619 More info . . . 0619 22 April 1911 Canal Widening: General view looking east from moveable dam
0620 More info . . . 0620 22 April 1911 Moveable Dam: General view in closed position
0621 More info . . . 0621 22 April 1911 Moveable Dam: Detail south end, canal unwatered, lowering girder