Item Number Date Description
0562 More info . . . 0562 20 May 1910 Gate for Widened Canal: Upper end south leaf, ready for launching
0563 More info . . . 0563 20 May 1910 Gate for Widened Canal: South leaf launching
0564 More info . . . 0564 12 June 1910 New Lock and Canal: Lock pit, looking east from west bank of pump well excavation
0565 More info . . . 0565 12 June 1910 New Lock and Canal: Looking west from 3940 E, showing large rock overcast by shovel; to be drilled, fired, and removed later
0566 More info . . . 0566 12 June 1910 New Lock and Canal: Looking west from 3820 E, showing rock quarried by drill holes 1 ft. apart, instead of channeling
0567 More info . . . 0567 12 June 1910 New Lock and Canal: Looking west from 3180 E, showing retaining wall and rise in rock at about 3000 E
0568 More info . . . 0568 12 June 1910 New Lock and Canal: Looking east along south side, showing first complete cut in rock
0569 More info . . . 0569 11 July 1910 Moveable Dam: Placing center and track castings
0570 More info . . . 0570 11 July 1910 Canal Widening: Dredging at westerly end, view looking east from abreast of timber pier
0571 More info . . . 0571 4 September 1910 New Lock and Canal: Lock pit excavation, looking southwest from east cofferdam
0572 More info . . . 0572 4 September 1910 New Lock and Canal: Lock pit excavation, looking southwest from 3500 E - 460 N
0573 More info . . . 0573 29 October 1910 New Lock and Canal: Bridge abutment for side track at north end proposed embankment, showing foundation
0574 More info . . . 0574 29 October 1910 New Lock and Canal: Bridge abutment from side track, looking southeast within concrete forms
0575 More info . . . 0575 31 October 1910 Canal Widening: Concrete electric light pole and cast iron snubbing post in concrete braced to canal wall
0576 More info . . . 0576 3 November 1910 Moveable Dam: 30-ton derrick with 128 ft. boom used in transferring and erecting