More info . . .
|
1461 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Receiving filling signal-control valve set to repeat order back to lockmaster, combination receiver |
More info . . .
|
1462 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Water level indicator, shelter 5N, Davis Lock, showing level in Fourth Lock |
More info . . .
|
1463 |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Water level transmitter, shelter 4N, Davis Lock, operating indicator on Shelter 5S, Fourth Lock |
More info . . .
|
1463a |
25 October 1935 |
St. Marys Falls Canal, Lock Filling Control-Signal System: Water level transmitter, shelter 4N, Davis Lock, operating indicator on Shelter 5S, Fourth Lock |
More info . . .
|
1464 |
13 December 1935 |
St. Marys Falls Canal: Blocking in the Davis Lock for drydocking of floating plant the U.S. Engineer Office, Duluth |
More info . . .
|
1465 |
17 December 1935 |
St. Marys Falls Canal: Floating plant (Duluth Office) drydocked in Davis Lock |
More info . . .
|
1466 |
April 1936 |
Davis Lock: View of lower portion of block No. 216 in north wall |
More info . . .
|
1467 |
April 1936 |
Davis Lock: View of joint between blocks Nos. 221-222 in north wall |
More info . . .
|
1468 |
April 1936 |
Davis Lock: View of block No. 231 in north wall |
More info . . .
|
1469 |
April 1936 |
Davis Lock: View of block No. 117 in south wall |
More info . . .
|
1470 |
April 1936 |
Davis Lock: View of stepped call separating valve pit and debris pit No. 4 |
More info . . .
|
1471 |
5 December 1936 |
Davis Lock: Repairs to masonry; temporary housing under erection showing frame and canvas sections, bracing, and staging |
More info . . .
|
1472 |
5 December 1936 |
Davis Lock: Repairs to masonry; temporary housing under erection showing method of supporting staging |
More info . . .
|
1473 |
5 December 1936 |
Davis Lock: Repairs to masonry; temporary housing under erection showing method of roofing, arrangement of times supporting staging, etc., rear view |
More info . . .
|
1474 |
28 December 1936 |
Davis Lock: Repairs to masonry; arrangement of compressors and receiver in compressor house |